WATER SUPPLY / SEWAGE / FLOOD PROTECTION PROJECTS

PROJECT OWNER PROJECT COST CONSTRUCTION ASSIGNMENT
Peristeri Municipality: Rainwater pipes ATTICA STATE 2.010.509,09 € 25/06/09
Vrillissia Municipality: Urgent flood protection works ATTICA STATE 1.011.452,18 € 25/09/07
Farsala Municipality: Sewage network FARSALA DEYA 1.544.952,44 € 12/10/06
Chaidari stream: Completion of settlement AP28 / 03 MINISTRY OF PUBLIC WORKS & ENVIRONMENT 662.910,13 € 23/08/06
Chalandri Municipality: Construction of rainwater pipes ATTICA STATE 1.317.849,66 € 27/07/06
Drainage of sewage and rainwater in other sectors of the city of Preveza PREVEZA DEYA 560.109,55 € 28/02/04
Water supply of Palamas municipality PALAMAS DEYA 2.482.676,75 € 03/10/03
Olympic Equestrian Center & New Athens Hippodrome – Construction of sewer-rainwater drainage networks and water supply and irrigation networks MINISTRY OF PUBLIC WORKS & ENVIRONMENT 2.087.608,65 € 01/05/02
Larissa city sewerage New State Networks LARISA DEYA 3.195.876,14 € 23/12/02
Reservoir Ag. Stefanou Overflow altitude +351.00 m EYDAP 3.328.136,97 € 27/12/99
Volos Industrial Area – Rainwater drain pipe VIPETVA S.A. 5.332.441,06 € 12/11/99
Saint Haralambis stream – Reconstruction works and surrounding areas ZAKYNTHOS STATE 1.140.790,69 € 06/10/99
CATEGORY: INFRASTRUCTURE
TYPE OF PROJECT: PUBLIC PROJECT

More projects