3.3 MW PV STATION IN ARGOLIDA

Engineering, procurement and construction (EPC) of 10 particularly difficult photovoltaic power plants in Lerna, Argolis with a total capacity of 3.3 MW.

This project was successfully constructed in a very short period of time on an extremely inclined hill. The inclination ranges from 45% to 70%, requiring thus a particular design study. .

The panel mounting structures were designed exclusively for this project. The foundation of the bases was made on rocky soil with the method of concrete mixing, using drilling machines that were modified accordingly, dedicated to this application.

Mounting structures: Fixed METALLODOMI SA
Solar Panels: Renesola JC290M-24 / Bb and JC300M-24 / Bb
Inverters: Power One Trio 27,6TL

CATEGORY: SELECTED PROJECTS, CATEGORY: SOLAR ENERGY
TYPE OF PROJECT: PRIVATE PROJECT
YEAR OF ASSIGNMENT: 2012