ATHENS INTERNATIONAL AIRPORT // WORKS

ADDITIONAL WORK ON THE EASTERN AIRWAY & BRANCHES OF C&D WS 1053

  • Electric Cable Network {Duct Banks} 11,500 meters long
  • Rain, Sewage, Fire, Irrigation Network 1,500 meters long
  • Installation of prefabricated electrical wells along the airstrips and trams
  • Improvement and maintenance works of open ditches

Expenditure € 2,076,054

CONSTRUCTION OF BASEMENTS OF EXTERNAL BENEFITS NETWORKS IN AREA A14 & A15

Rainwater collectors (SWDS), sewage (SW), water pipes (PW), irrigation pipes (IRR), fire pipes (FW) and pipes of electrical telecommunication and electronic pipes as well as the main pumping station (pumping station 1) were constructed on the main access road (Main Access Road) to Athens Airport in Spata.

Cost: € 1,671,184 (the cost of the project does not include the embedded materials, which were supplied by the German contractor HOCHTIEF)

CATEGORY: INFRASTRUCTURE
TYPE OF PROJECT: PRIVATE PROJECT
BUDGET BEFORE VAT: 3.747.238 €
YEAR OF ASSIGNMENT: 1998

More projects